Connection to the central water supply and other utilities is carried out in accordance with the Decree of the Government of the Russian Federation No. 83 of 13.02.06. To carry out work on connecting the water supply, you need to perform a number of actions and collect a package of documents.

How to connect to the water supply
How to connect to the water supply

It is necessary

  • - site plan;
  • - application to the water utility;
  • - title documents for the house and land;
  • - technical conditions;
  • - conclusion of the SES;
  • - agreement on the development of design and estimate documentation;
  • - design and estimate documents signed by SES;
  • - permission of communal systems;
  • - contract with licensed installers;
  • - commissioning certificate;
  • - agreement on payment and delivery;

Instructions

Step 1

First of all, get a site plan at a scale of 1: 500. It must indicate all engineering and technical underground communications. Such a document can be obtained from the Federal Center for Land Registration, Cadastre and Cartography.

Step 2

With this plan, contact the department of the district water utility. Write a statement, present documents of title to the house and land. After one month, you will be given the technical conditions for the connection.

Step 3

With the received technical conditions, with documents for the house and land, contact the central office of the SES. Write an application for an opinion on the connection to the water supply.

Step 4

Sign an agreement with an organization licensed to develop design and estimate documentation.

Step 5

Reserve design estimates at SES.

Step 6

Obtain permission to carry out land works in the district communal systems.

Step 7

Only organizations that have a license for this type of work can lay and connect the water supply system, insert into the central system. To do this, you should contact the water utility and get a list of organizations. With the selected team of installers, conclude a contract for the laying of a water supply system and the installation of metering devices.

Step 8

Self-installation of a water supply system, tie-in, installation of metering devices are strictly prohibited. The documents received are not grounds for carrying out work without the involvement of specialists.

Step 9

After laying the water supply system and installing metering devices, invite representatives of the water utility to draw up an act of putting the devices into operation.

Step 10

Sign an agreement with the water utility for the supply of water and payment for metering devices.